Two remodel bids for the same kitchen can differ by tens of thousands of dollars. The difference usually hides in what each bid leaves out, not in the price on the last page.
To bid on a remodel, you define a clear scope, share the same plans and specifications with two or three licensed contractors, and ask each for an itemized proposal with allowances, a schedule, and a payment plan.
You then compare the bids line by line, check licences and contract terms under California law, and clear up any gaps before signing. The best bid is the most complete and clearly specified one, not simply the lowest.
What Remodels Cost Today
Knowing typical spending helps you judge whether a bid is realistic. The 2026 U.S. Houzz & Home Study, reported by Kitchen & Bath Business, found median renovation spend held at $20,000 in 2025, with the top 10% of projects reaching $150,000 or more.
Kitchens cost more than most rooms. The same study put median kitchen spend at $24,000, up 9.1%, while a major remodel of a larger kitchen reached a median of $75,000.
Bay Area projects usually run higher, since labour, permits and materials cost more here. Planned budgets are cooling, though, with median planned renovation spend for 2026 down 25% to $15,000.
| Project type | U.S. median spend (2025) | Note |
| All renovations | $20,000 | Top 10% spent $150,000 or more |
| Kitchen renovation | $24,000 | Up 9.1% from 2024 |
| Major remodel, larger kitchen | $75,000 | All cabinets and appliances replaced |
| Major remodel, smaller kitchen | $46,000 | All cabinets and appliances replaced |
| Smaller primary bathroom | $18,000 | Under 100 sq ft |
Quick Steps to Bid on a Remodel
Step 1: Define the Scope Before Asking for Bids
Contractors can only price what they can see. Before calling anyone, list what stays, what goes, and what changes, from layout and cabinets to plumbing fixtures, lighting, flooring, and finishes.
Drawings or a clear sketch with measurements help every bidder price the same job. If the layout is still open, settle the kitchen layout first.
Decide which items you will choose later. These become allowances in the bid, such as a set budget for tile or light fixtures.
Step 2: Choose Two or Three Licensed Contractors
Three bids are usually enough to see a fair price range without losing weeks. More bids often add confusion rather than clarity.
In California, check each contractor’s licence with the Contractors State License Board before meeting. Firms that hold their own plumbing and electrical licences can often price those trades more accurately than firms that rely on subcontractors.
Ask how long each contractor has worked locally and ask for photos of finished jobs. A firm that has completed hundreds of kitchens and baths can usually price faster and with fewer surprises.
Step 3: Ask for an Itemized Proposal
A single lump-sum number tells you very little. Ask for a breakdown of labour and materials by trade or phase, so you can see where the money goes.
Good proposals spell out specifications, such as the number of paint coats, tile type and where work stops. The Kitchen and Bath Company of Palo Alto, for example, works from a list of more than 5,000 job specification items.
Allowances, permit fees, debris removal and floor protection should all be listed. If something is missing, ask whether it is included or extra.
Allowances and Change Orders
An allowance is a placeholder budget for items not yet chosen, such as fixtures or paint colours. If your final pick costs more, the difference is added to the price.
Work outside the agreed scope is handled through a change order. In California, change orders must be written and become part of the contract.
Step 4: Compare Bids Line by Line
Put the bids side by side and match each line. A low bid that leaves out permits, demolition or electrical upgrades can end up costing the most.
| What to compare | What to look for |
| Scope | Same rooms, fixtures, and layout in every bid |
| Specifications | Brands, models, finishes and number of coats |
| Allowances | Realistic amounts for tile, fixtures and lighting |
| Permits and inspections | Who applies, who pays and when inspections happen |
| Schedule | Start date, duration and inspection dates |
| Payment schedule | Payments tied to completed work |
| Exclusions | Items not included, such as appliances or wall patching |
Unusually low allowances are a common trap. They make a bid look cheaper, then push costs up once you choose real products.
California Rules Every Remodel Bid Must Follow
California treats most remodels as home improvement contracts with strong consumer protections. Projects over $500 in combined labour and materials must have a written contract, according to the CSLB consumer guide.
The down payment cannot be more than $1,000 or 10% of the contract price, whichever is less, and there is no exception for special-order materials. Later payments must match work completed or materials delivered.
The contract must also include a payment schedule showing what each payment covers. Most home improvement contracts give you three business days to cancel after signing.
Red Flags in a Remodel Bid
Be careful with bids that ask for large deposits, cash payments or quick signatures. These go against California rules and often signal trouble ahead.
Vague wording such as “install bathroom” or “standard finishes” leaves too much open. Missing licence numbers or no mention of permits are also warning signs.
A bid far below the others deserves questions. Ask the contractor to walk you through it line by line before you accept it.
Frequently Asked Questions
How many bids should I get for a remodel?
Two or three bids from licensed contractors are usually enough. More than that tends to slow the process without improving the decision.
Should I always choose the lowest bid?
No, the lowest bid often leaves out items or uses small allowances. Compare scope, specifications, and exclusions before you compare price.
How long does it take to get a remodel bid?
Simple kitchen and bath projects can be priced within days once the scope is clear. Larger remodels with design work and engineering take longer.
Can a contractor charge more than the bid?
Only through written change orders or when allowances are exceeded. A clear scope and realistic allowances keep the final price close to the bid.
Conclusion
A good remodel bid is less about the final number and more about what stands behind it. Clear scope and detailed specifications protect both your budget and your schedule.
Define the work, invite two or three licensed contractors and ask for itemized proposals with allowances, schedules, and payment plans. Compare them line by line, and check that each follows California rules on contracts, deposits, and change orders. The strongest remodel bid is the one with the fewest open questions.
The Kitchen and Bath Company of Palo Alto prepares itemized kitchen and bath proposals, with a budget usually ready within 48 hours of the first meeting. Start with a consultation for kitchen remodeling and get a clear, line-by-line price.